System:
ECCO
Year:
2008
Project
"Sorrentina"
Built in 2008. The tunnel is situated at the famous coast of Sorrento in the south of Naples. Aigner Tunnel Technology is responsible for installation of a turn-key filtration plant
including the ECCO system and the complete technical equipment. Three fans each with 120 m3/s airflow are installed. 3 ECCO units with total 360 m3/s and technical equipment for high voltage and filter cleaning were supplied.
Estimated opening in 2010.
Technical data
System: | 1 x ECCO |
Length: | 5171 m |
Tubes: | 1, bidirectional traffic |
Airflow: | 360 m3/s |