System:
ECCO + ECCONOxCAT
Year:
2007
Project
"Calle 30"
The Madrid Calle 30 in the heart of Madrid is the world‘s biggest underground project. Traffic is moved under ground
to create more recreational areas.
Aigner Tunnel Technology has delivered nine turn-key ECCO filtration plants including technical equipment.
World Premiere: ECCONOxCAT
Technical data
Plants:
| 1x ECCO, 200 m3/s 6 x ECCO, each 150 m3/s 1 x ECCO + ECCONOxCAT 1 x ECCO + ECCONOxCAT |
Length: | 34 km |
Tubes: | Ring road, uni-directional |