System:
FIRECURTAINS
Year:
2009
Project
"Roppen"
To increase the safety in road tunnels a second tube was constructed in the Roppen Tunnel in 2009. Aigner Tunnel Technology is responsible for development and first
installation of FIRECURTAINS to save lifes in case of fire.
Technical data
System: | FIRECURTAINS |
Length: | 5.069 m |
2 Tubes: | 4 curtains in each tube |