System:
ECCO
Year:
2006
Project
"Le Vigne Tunnel"
Built in 2006. The tunnel „Le Vigne - Galleria di Cesena“ is
the link between the highway 45 from Rome to the SS 9
main road.
To avoid portal emission, at each end of the two tubes, a filtration plant is installed with exhaust dampers in the ceiling of the tunnel.
Aigner Tunnel Technology is responsible for the installation of two turn-key filtration plants including the ECCO system and the complete technical equipment.
Technical data
System: | 2 x ECCO |
Length: | 1.581 m |
Tubes: | 2 |
Airflow: | 250 m3/s |