Cesena, Italy

Data

System:
ECCO

Year:
2006

 

Project
"Le Vigne Tunnel"

Built in 2006. The tunnel „Le Vigne - Galleria di Cesena“ is
the link between the highway 45 from Rome to the SS 9
main road.

To avoid portal emission, at each end of the two tubes, a filtration plant is installed with exhaust dampers in the ceiling of the tunnel.

Aigner Tunnel Technology is responsible for the installation of two turn-key filtration plants including the ECCO system and the complete technical equipment.


Technical data

System:2 x ECCO
Length:1.581 m
Tubes:2
Airflow:250 m3/s